Before you hire

What a written backyard proposal should include

If you can read it area by area, you can compare it, question it and hold it up against the work.

  • 8min read
  • 11parts
  • Written for yards in LA County and the Conejo ValleyBy ACE Design & Build · October 10, 2026
  • CSLB #1132942 (Class B, General Building)
  • 5-star reviews on Google
  • Free site visit by the lead contractor

A good written proposal lists the work area by area, says what's included and what isn't, and names what could change it. It should also explain how changes get approved in writing, and how payments are tied to work that's finished.

Totals are easy to compare. The work behind them is harder to see.

In this guide11
  1. 01The work, area by area
  2. 02What's included, and what isn't
  3. 03What could change the scope
  4. 04How changes get approved
  5. 05Options at more than one level
  6. 06Is the plan in the proposal the plan that gets built?
  7. 07Payments tied to finished work
  8. 08Specialty work, and who does it
  9. 09The schedule, in stages
  10. 10Three parts to find first
  11. 11What we check at the site visit
01

The work, area by area

A single line that says "backyard remodel" can't be compared with anything. When the work is listed area by area, you can lay two proposals on the kitchen table and see where they differ.

For each area, look for:

  • What comes out, like old concrete, the lawn or a leaning wall
  • What goes underneath: the base, the drain lines, and any gas, power or water lines
  • What goes on top, with the materials named by type and finish
  • How big the area is, so you can tell whether two proposals measured the same yard

Pay the most attention to what goes underneath. Two patios can look the same on paper and be built very differently below the surface. If a proposal doesn't mention the base or the drainage, ask.

01Two patios can look the same on top and be built very differently underneath.

The totals are easy to compare. The work behind them is harder to see.

02

What's included, and what isn't

A lower total can simply mean less work. Check whether each proposal covers:

  • Removing what comes out and hauling it away
  • Drainage, and where the water goes
  • Changes to your sprinklers
  • Gas, power and water lines for anything you're adding
  • Engineering and permits, if the work needs them
  • Cleanup at the end

If something isn't included, like an HOA application, the proposal should say so. If a choice is still open, like the patio finish, it should say when and how you'll decide it.

03

What could change the scope

Some things can't be known until the work starts. A good proposal names the common ones in our area up front.

  • What's under old concrete. You may not see old pipes, roots or soft fill until the slab comes out.
  • The soil. Expansive clay swells when it's wet and shrinks as it dries. It turns up in many parts of Southern California. Where it's likely, a soils engineer may test it, and the design follows that report.
  • Mapped hazard zones. In a state-mapped landslide or liquefaction zone, the city or county may ask for a geotechnical report before it issues permits.
  • Access. A narrow side yard can mean smaller machines, or digging by hand.
  • Your city's rules. There's no single LA rule.
    • City of LA. Building permits come from LADBS. On lots in the City's mapped Hillside Area, the City limits how much soil can be graded and hauled away.
    • Unincorporated LA County. LA County Public Works issues building permits. Gas, electrical and plumbing work can need permits of its own, even when the structure needs no building permit.
    • Other cities in LA County. Each city sets its own rules, and some review walls and fences even when no building permit is needed.
    • The Conejo Valley. Thousand Oaks and Newbury Park follow the City of Thousand Oaks. Oak Park is unincorporated Ventura County. The City of Westlake Village has its own rules, and some Westlake Village addresses are in the City of Thousand Oaks.

A good proposal names the ones that apply to your yard and says what happens if one turns up. "We'll deal with it" isn't enough in writing.

Your city's rules decide, and we check them for your address at the site visit. General information, not legal advice. Last reviewed: October 2026

A printed, stapled document on a patio table beside a pen, a tape measure, reading glasses and two paver samplesIllustration
02Read the proposal at the table, area by area, before you compare totals.
04

How changes get approved

Changes can come up on any yard, especially once the old concrete is out. What matters is how they're handled.

Under California law, a change to a home improvement contract only becomes part of the contract if it's in writing and signed by both sides before that work starts. The written change, called a change order, should say what's different, how the price changes and how it affects the payment schedule.

Look for a proposal that says who writes up a change and when you see it. A change agreed to in the driveway, with paperwork to follow, is how a yard ends up costing more than planned. Ask any contractor you're comparing, us included, how a change gets written up and signed before that work starts.

05

Options at more than one level

A proposal doesn't have to be one take-it-or-leave-it plan. It can show more than one way to build part of the yard, or mark which parts could wait for a later phase. That helps you fit the plan to your budget.

When there are options, ask what changes between them. The surface or the size might change. What's underground, like the base and the drainage, shouldn't.

More on splitting the work: How to plan a whole backyard and build it in phases

06

Is the plan in the proposal the plan that gets built?

A painful story in LA backyard reviews: a design that looked fine at signing but couldn't be built once the crew showed up. Three things help:

  • The yard is checked before anything is drawn: slope, drainage, access and utilities.
  • The proposal and any drawings describe the same work.
  • The crew builds from that same plan, and any change is written up and signed first.

For a pool, California law asks for more. The contract has to include a plan and a scale drawing that show the pool's shape and size, and how it will be built and equipped.

07

Payments tied to finished work

In general, California law limits the down payment on a home improvement contract. After that, payments can't get ahead of the work that's done or the materials delivered.

So read the payment schedule next to the list of work. Each payment should match a stage you can walk out and see, like the walls up or the patio base in.

Be careful with a schedule where most of the money is due before most of the work is done.

The CSLB consumer guide explains the state's rules for home improvement contracts, including down payments. General information, not legal advice.

08

Specialty work, and who does it

On a whole backyard, some of the work needs its own license, like pool construction and electrical. A licensed general contractor can run the project while licensed specialty contractors do those parts. A good proposal shows which parts those are.

Under California law, the contract has to say whether other licensed companies will work on the project. If they will, you can ask for a list with their names, contact details, license numbers and license types. You can check each license on the Contractors State License Board website.

At ACE, our own crews build your project, and they're covered by workers' compensation insurance. Pool shells and electrical work are done by licensed specialty contractors, under the same ACE contract. Ask us, as you'd ask anyone, who those companies are and what their license numbers are.

09

The schedule, in stages

A backyard project moves in stages: design, permits when they're needed, then the build. The build usually starts with what sits below and behind everything else: drainage, walls and any new gas, power or water lines. Surfaces and planting come after, and permitted work gets inspected along the way, sometimes before it can be covered up.

A proposal should show that order and say what could add time: permits, engineering, special-order materials and weather. A California home improvement contract also has to list approximate start and finish dates. If a date matters to you, like a graduation party or the holidays, say so early.

10

Three parts to find first

On any proposal you're handed, find three parts before you look at the total: the work listed by area, what's included, and what could change it. If one is missing, ask for it in writing.

11At your address

What we check at the site visit

Before anything goes into a proposal, our lead contractor comes to your home and walks the yard with you. We look at:

  • What could change the scope: what's under old concrete, the soil and your city's rules
  • Access and utilities that affect the plan
  • Which parts could wait for a later phase
  • Your budget, if you'd like to share it

The site visit and the written proposal are free.

Related services: Full Backyard Remodel What your written proposal covers

Free site visit and free written proposal.

Sources

Official pages we used for this guide · 7

Want us to look at your yard?

Free site visit and written proposal for homes in Los Angeles County and the Conejo Valley. Where we work

What are you planning?

Call (310) 596-5266

Request a site visit, and our lead contractor will walk the yard with you and check what can be built before anything is drawn.

Path lights along a new lawn strip and planting bed at night

After you ask

  1. 01We call or text to set a time
  2. 02Our lead contractor walks the yard with you
  3. 03You get a written proposal