Full backyard remodel in Los Angeles

One plan for the whole yard, built in the right order, all at once or in stages. Our lead contractor starts by walking it with you.

Call (310) 596-5266

Free site visit and written proposal for homes in Los Angeles County and the Conejo Valley. Where we work

Start here

Tell us about your backyard

Our lead contractor walks the yard with you, listens, and checks slope, drainage, access and utilities. Then you get a written proposal for your project.

Free site visit and written proposal for homes in Los Angeles County and the Conejo Valley. Where we work

What are you planning?

Your proposal lists the work area by area, what's included, and what could change it. What the proposal covers

Why one plan

Why we plan the whole yard first

When a backyard is done one piece at a time, each job gets planned on its own. Nobody looks at where the pieces meet. That's where the trouble shows up.

  • Sprinkler lines
  • Gas line
  • Drain line
A white drain line with a tee laid in an open trench, before it is covered
On one of our sites: a drain line in the trench, before the surfaces go on top.
  1. 01Pool and sprinklers

    Piece by pieceThe pool dig crushes the new sprinkler lines.

    With one planEach phase is planned so the next one doesn't undo it.

  2. 02Patio by the back door

    Piece by pieceThe new patio has no drain under it, so water sits by the back door.

    With one planDrainage and grading are decided first, for the whole lot.

  3. 03Grill and gas line

    Piece by pieceThe grill needs a gas line, so a patio that's a year old gets cut open.

    With one planGas, power and water lines go in once, before the surfaces.

One plan doesn't have to mean one big project. It means the order is right, even if you build in stages.

Your backyard list

Make your backyard list

Check what you want the yard to do. Bring the list to your site visit, or send it with your request.

Under the surface

What happens under the surface

Here's what we check and build at each step, and what goes wrong when a step gets skipped.

01

Water and grade

What we check

We check where water comes from, where it's allowed to go, and how the ground slopes.

What we build

We build the grading, the drains and the pipe to an approved outlet.

If it's skipped

Skip it, and water sits by the house or under the new patio.

02

Walls and structure

What we check

We check the soil, the slope and what each wall holds up, and whether engineering is needed.

What we build

Footings and walls go in, with gravel and drains behind them.

If it's skipped

Skip it, and walls lean or crack, and whatever sits above them moves too.

03

Gas, power and water lines

What we check

We mark where the grill, lights, fire feature and hose bibs will go.

What we build

Lines run under the future patio, with permits where they're needed.

If it's skipped

Skip it, and a new patio gets cut open later.

04

Patios, decks and pool surrounds

What we check

We check the base, the slope and the finish near water.

What we build

A packed base, edges that hold, joints and drains.

If it's skipped

Skip it, and pavers sink and puddles form where you walk.

05

Planting and finishing

What we check

We look at sun, soil, your water provider's rules and how you'll use each area.

What we build

Drip lines, plants, mulch and lighting.

If it's skipped

Skip it, and plants fight the site and need more water than they should.

Pavers set on a sand bed, with the drain line already in the base.
Build in phases

Not ready to do it all at once?

Plan the whole yard now and build it in phases, on your timing. Each phase is planned so the next one doesn't tear it up.

We plan the whole yard even if you start with one part.

Your proposal can split the work into phases, so you can choose where to start.

Built
  1. Phase 1

    Drainage and walls

  2. Phase 2

    The patio and the outdoor kitchen, with lines run for later

  3. Phase 3

    Planting and lighting

On video

One backyard, from bare dirt to finished

A whole yard built in the right order: the ground and the lines first, then the pool, the patio, the lawn and the fire feature, and the first evening outside.

  • Ground, drains and lines before the surfaces
  • Pool, covered patio and lawn planned as one yard
  • Lighting and fire for the evenings

Bare dirt to a finished backyard A pool, lawn, covered patio and a long fire feature, from the first dig to the first evening.

Design

Backyard design, measured on site

Design starts at the site visit, with real measurements, not a photo. You see the plan and approve it before anything is built.

Already have plans from your own designer? Send them with your request, and our lead contractor goes over them before the visit.

  1. 01Measured on site

    Real measurements at the site visit, not a photo.

  2. 02Drawn as one plan

    The whole yard on one plan, so the parts fit.

  3. 03Approved by you

    You see the plan before anything is built.

Pools in the plan

Pool and backyard projects

The pool shell is built by a licensed pool specialist (C-53), scheduled and supervised by our team, under one ACE contract.

A pool shapes the rest of the yard: the deck, the walls on a slope, the drainage and the planting around it. We plan them together.

  • The deck
  • Walls on a slope
  • Drainage
  • Planting
One team

Who does the work

One ACE team designs your yard, manages the project and builds it with our own crews. Gas, electrical, plumbing, drainage and planting are planned and scheduled as one project, so you don't have to find or manage anyone yourself.

Pool shells and electrical work are done by licensed specialists, scheduled and supervised by our team, under one ACE contract.

Coordinated as one project

ACEOne team runs it
  • Gas
  • Electrical
  • Plumbing
  • Drainage
  • Planting
  1. 01We design it

    One plan for the whole yard, measured at your site visit.

  2. 02We manage it

    One team, one schedule and one ACE contract.

  3. 03We build it

    With our own crews, in the order the yard needs.

Our crew taking out an old slab, the first step of a new yard.
The proposal and the build

Your proposal and how the build runs

  1. What the proposal covers

    Your proposal lists the work area by area, what's included, and what could change it.

  2. Who runs the build

    One ACE team runs the project, and our own crews build it. You'll know who to call.

  3. Your yard while we work

    You'll be living next to the work. Before we start, we agree on work hours, the gate the crew uses and how pets stay safe.

  4. After we finish

    Before we call the job done, we walk the yard with you. If a question comes up later, call or text us.

Every yard is different

What shapes the plan for your yard

Two yards that look alike can need very different work. The slope, the access, the soil and what's under the old concrete all change the plan. That's what the visit is for.

01Your yard as it is

  • How big the area is01
  • Slope and soil02
  • Drainage03
  • How equipment gets in: side yard width, gates, steps04
  • What's there now and has to come out, like old concrete or an old pool05

02What you add, and how

  • How many parts of the yard are involved06
  • New gas, power and water lines07
  • Materials and finishes08
  • Engineering and permits09
  • All at once, or in phases10

Your proposal comes from measuring your yard, and it can show what could wait for a later phase.

Tell us what matters most to you when we talk. We plan the visit and the proposal around it.

What clients say about their backyard projects

5-star reviews on Google
We hired Ace Design & Build for a full backyard remodel that included a new pool and outdoor kitchen, and we couldn't be happier with the result. They completely transformed the space and did a great job with the layout and overall design. ... We've already gotten so much use out of the backyard and it feels like we have a whole new space to enjoy.
Rachel W.Los Angeles · 2026G
They listened to our ideas, helped bring our vision to life, and paid attention to the details throughout the project. The quality of the work really stood out, and our backyard turned out beautiful. The process was smooth, communication was great, and the team was respectful of our home and property.
Goldie B.Los Angeles · 2026G
Very trustworthy and clear. Always made us feel comfortable with our backyard. Made the process very smooth and easy.
Abraham Z.2026G
Questions

Questions about a full backyard remodel

01Do I need permits?

Many backyard projects need at least one permit. Walls, patio covers, pools, and new gas or electrical lines often do. Which ones depends on the work and on your city, since the City of LA, LA County and each city have their own rules. We check what applies at the site visit and tell you which permits your project needs, and they become part of the plan and the schedule.

02How long does a backyard project take?

It moves in stages: design, permits when they're needed, then the build, from drainage and walls to lines, surfaces and planting. Permits, engineering, special-order materials and weather can add time. We'll tell you which ones apply to your project.

03Can we stay home during the work?

Usually, yes. Backyard work happens outside, but there will be noise, dust and people coming and going, and some days the yard or the side yard will be off-limits. Before we start, we go over access, parking and pets.

04Can we build in phases?

Yes. Many people plan the whole yard once and build it over time. Each phase is planned so the next one doesn't undo it: for example, drainage and walls first, then the patio and kitchen, then planting.

05Do I need HOA approval first?

If you have an HOA, check its rules early. Many HOAs review plans before work starts, and that review is separate from city permits. Bring the guidelines to the site visit, and we'll plan around them.

06Is the site visit free?

Yes. The site visit is free, and so is the written proposal that follows. We offer both to homes in Los Angeles County and the Conejo Valley.

07Can you work from my own designer's plans?

Send them with your request, or bring them to the site visit. Our lead contractor goes over them before the visit. We'll check them against the real yard, the drainage and the access before we write the proposal.

08What's in the written proposal?

The work, area by area: patio, walls, drainage, planting and so on. What's included and what isn't. What could change it, like what we find under old concrete or what your city asks for. And how changes are handled once work starts.

09What if something comes up during the work?

We explain what we found and what it means for the work. If something needs to change, we write it up and you approve it before we do it. California law also requires changes to a home improvement contract to be in writing and signed before that work starts. General information, not legal advice.

All questions →

Start with a free site visit

Free site visit and written proposal for homes in Los Angeles County and the Conejo Valley. Where we work

What are you planning?

Call (310) 596-5266Text us
Path lights along a new lawn strip and planting bed at night

After you ask

  1. 01We call or text to set a time
  2. 02Our lead contractor walks the yard with you
  3. 03You get a written proposal
CA License #1132942 · Check on CSLB

Licensed in California

ACE Design & Build

License #1132942 (Class B, General Building). Check it on the CSLB website.

5-star reviews on Google

What you can check before we meet

Insured. Workers' compensation insurance for our crews.

Who does the work. One ACE team designs and manages your project, and our own crews build it. Any work that needs a specialty license, like a pool shell or electrical, is done by a licensed specialist, scheduled and supervised by our team, under one ACE contract. How the work gets done

Written contracts. The CSLB consumer guide explains what a California home improvement contract should include. We go over ours with you before you sign.

Call