Planning

How to plan a whole backyard and build it in phases

One plan for the whole yard doesn't have to mean one big project.

  • 8min read
  • 7parts
  • Written for yards in LA County and the Conejo ValleyBy ACE Design & Build · October 10, 2026
  • CSLB #1132942 (Class B, General Building)
  • 5-star reviews on Google
  • Free site visit by the lead contractor

Plan the whole yard once, then build it in phases that don't undo each other. The first phase is usually the work under the ground: drainage, grading and walls, plus lines for anything you'll add later. The patio, the kitchen and the planting can follow when you're ready.

You don't have to do it all at once. You do have to get the order right.

In this guide7
  1. 01Why the order matters
  2. 02What goes in the first phase
  3. 03Ways to split a yard into phases
  4. 04Planning around a budget
  5. 05What to bring to the site visit
  6. 06Questions to ask about phasing
  7. 07What we check at the site visit
01

Why the order matters

When a yard is built one piece at a time, each job usually gets planned on its own. Nobody looks at where the pieces meet, and that's where the trouble shows up.

  • The pool dig crushes sprinkler lines that went in the year before.
  • The new patio has no drain under it, so water sits by the back door after a rain.
  • A new grill needs a gas line, so a patio that's a year old gets cut open.

Each one comes from building the top layer before the layer under it. A pipe is simple to lay before the patio base goes in. Added later, it means cutting through finished paving.

A plan for the whole yard settles the order up front, even if you start with one wall or one patio. So whoever you talk to, ask them to look at the whole yard, not just the first part.

You don't have to do it all at once. You do have to get the order right.

02

What goes in the first phase

The first phase is mostly work you won't see once it's done.

  1. Drainage and grading. The ground gets shaped to fall away from the house, and drain lines carry water to an outlet where it's allowed to go. Any drain that will run under a future patio goes in now.
  2. Walls. Retaining walls on a slope come early, because everything above them depends on them. Each one needs a footing and a path for water to get out, usually with gravel behind it.
  3. Lines for later. Gas, power and water get run to where the grill, the lights or a future pool's equipment will sit. If you're not ready for a line yet, an empty pipe under the patio, called a sleeve, keeps a path open for it. These lines often need their own permits and inspections.

Which permits each phase needs depends on where you live.

  • City of LA. Building and trade permits come from LADBS. On lots in the City's mapped hillside areas, the City limits how much soil can be graded and hauled away, so ask early how a future pool dig fits in.
  • Unincorporated LA County. LA County Public Works issues building permits. Even a structure that needs no building permit can need separate gas, electrical or plumbing permits.
  • Other cities in LA County. Each one sets its own rules, and some review walls and fences even when no building permit is needed.
  • The Conejo Valley. Thousand Oaks and Newbury Park fall under the City of Thousand Oaks. Oak Park is unincorporated Ventura County. Some Westlake Village addresses on the Ventura County side are in the City of Thousand Oaks. The City of Westlake Village has its own rules.
  • Protected oaks. The City of LA, unincorporated LA County, Thousand Oaks and many other places here protect native oaks. A trench in the root zone can need a permit, so lines for later phases get routed with that in mind.

Rules can also change between phases. Under state law, a project is generally held to the building standards in effect when its permit is applied for, so a phase you build later may be checked against newer rules than the first one was. For example, a new edition of California's wildfire building code took effect in January 2026.

Your city's rules decide, and we check them for your address at the site visit and during design. General information, not legal advice. Last reviewed: October 2026

Phase 1Phase 2Phase 3
01One plan for the whole yard, built in three phases. Pick a phase to see where it sits.
Phase one in a backyard: a new block retaining wall along the back, a drain pipe laid out, gravel piled, and the future patio area still bare dirt marked with stakes and string linesIllustration
02Phase one: the wall and the drain lines go in first, and the patio area waits, staked out.
03

Ways to split a yard into phases

Every yard is different. Here are a few common splits.

01

The usual order

Phase 1: drainage and walls. Phase 2: the patio and the outdoor kitchen, with lines run for later. Phase 3: planting and lighting.

02

A sloped yard

On a steep lot, the first phase is often the walls, drainage and grading that give you a level place to use. Steps and a patio on the new level come next. Planting on the slope comes last.

03

A pool later

The plan holds the pool's spot open, along with a way in for the machines that will dig it, so early walls and planting stay out of that path. A narrow side yard limits which machines fit, so measure it before anything goes in along it. Power gets run toward where the pool equipment will sit, plus gas if the plan calls for it. California's energy code also sets rules for how a new pool can be heated, so ask early which heaters are allowed for yours. That decides which lines run to the equipment.

04

The area by the house first

Some families start with the patio off the back door, the part they'll use most, and leave the far end for later. That works if the drainage for the whole lot is decided first.

05

The lawn last, if you want a rebate

Many water providers offer lawn replacement rebates, and with many of them, approval has to come before any grass comes out. If the lawn is in a later phase, leave the grass in place until the rebate is approved. Some programs won't accept a dead lawn, and many set a deadline to finish once you're approved. Check your own provider's rules before you start.

More on phasing: Plan in phases

A crew laying turf beside a patio cover, seen from above
03One part of the yard at a time: new turf going in beside a patio cover.
04

Planning around a budget

If you have a budget in mind, tell us when we talk. We use it to plan the visit and the proposal. If the whole plan doesn't fit yet, it can be split into phases, usually with drainage and walls first. We explain this at the site visit and in the written proposal.

You may have seen cost ranges online. They can't account for your slope, your access, your soil or what's under the old concrete. That's what the visit is for.

If the budget won't cover it all yet:

  • Spend the first phase on what's hard to redo later: drainage, walls, the patio base and the lines under it.
  • Leave what's easy to add later: more plants, lights on lines already run, a grill on a gas line that's already there.
  • Ask what phasing adds to the cost. Each phase means setting up again and protecting what's already finished.
05

What to bring to the site visit

Nothing formal. These help us plan the phases with you:

  • Your list of what you want the yard to do. Make your backyard list if you don't have one yet.
  • A few photos of yards you like.
  • What you might add later, even years from now: a pool, a spa, an outdoor kitchen or lights. Those decide where lines run today.
  • Any date that matters, like a graduation party or a wedding, so the phases fit around it.
  • A property survey, a video of where the water went in the last rain, or your HOA's guidelines, if you have them. HOA review is separate from permits.
  • The budget you have in mind, if you'd like to share it.
A pencil sketch of a yard plan beside a folder on a patio table
04A list, a few photos and any dates that matter are enough to start planning the phases.
06

Questions to ask about phasing

Whoever you talk to, these questions show whether the phases were planned together.

  • What has to go in first, and why?
  • Which lines go in now for later phases, and where do they end?
  • Will a later phase cut into anything we build now?
  • How will equipment get in for each phase once the walls and the patio are built?
  • Which permits does each phase need, and who applies for them?
  • Does the proposal show each phase on its own, so we can choose where to start?
  • How are payments tied to finished work? California law limits the down payment on a home improvement contract, and payments can't get ahead of the work that's done or the materials delivered. The CSLB consumer guide explains the rules.
07At your address

What we check at the site visit

Our lead contractor comes to your home and walks the whole yard with you, including the parts you're not ready to build yet. We look at:

  • What has to happen first, like drainage and walls
  • Where lines for a future kitchen, pool or lights should run
  • How equipment will get in for each phase
  • Which parts could wait without being torn up later

Related services: Full Backyard Remodel Drainage

Free site visit and free written proposal.

Sources

Official pages we used for this guide · 11

Want us to look at your yard?

Free site visit and written proposal for homes in Los Angeles County and the Conejo Valley. Where we work

What are you planning?

Call (310) 596-5266

Request a site visit, and our lead contractor will help you sort out what comes first and what can wait.

Path lights along a new lawn strip and planting bed at night

After you ask

  1. 01We call or text to set a time
  2. 02Our lead contractor walks the yard with you
  3. 03You get a written proposal
CA License #1132942 · Check on CSLB
Call